Using Project Server 2007 and Sharepoint 3.0
I want to be able to give my project managers "full control" permission on
their project workspaces. If I grant them "full control" under Sharepoint,
they lose this permission when Project Server syncronizes the permissions
with Project Server. The permissions on the workspace defaults back to
"project manager". Is there anything I can do to get the "full control"
permission to remain?
The reason that I want to give the PM's "full control" is so that they can
manage the alerts for items created on the site. I don't believe they can do
this with just Project manager permission. If I'm barking up the wrong tree
here as well, please let me know.
Thanks,
Bill
I want to be able to give my project managers "full control" permission on
their project workspaces. If I grant them "full control" under Sharepoint,
they lose this permission when Project Server syncronizes the permissions
with Project Server. The permissions on the workspace defaults back to
"project manager". Is there anything I can do to get the "full control"
permission to remain?
The reason that I want to give the PM's "full control" is so that they can
manage the alerts for items created on the site. I don't believe they can do
this with just Project manager permission. If I'm barking up the wrong tree
here as well, please let me know.
Thanks,
Bill