G
ghostinhawaii
How so I set up a spreadsheet or databse to recognize the text, weekly as 7
days monthly 30 and annual as 365 and then apply that to a current date to
see a future date? I have not been able to figure this out. thanks
days monthly 30 and annual as 365 and then apply that to a current date to
see a future date? I have not been able to figure this out. thanks