Hi,
I have a master project that consists of several sub-
projects. The sub-projects each show as a summary line in
the master. Problem - changes to sub-projects do not show
when I open the master. I have to click on the + sign and
expand the sub-project before the changes are visible in
the master. (If the old subproject was 2 weeks and the
updated one is 4 weeks, I only see the 2 week summary line
in the master, until I expand the sub-project.) I would
have thought that changes should be visible immediately.
Have I missed a configuration option somewhere?
Thanks,
Kevin
I have a master project that consists of several sub-
projects. The sub-projects each show as a summary line in
the master. Problem - changes to sub-projects do not show
when I open the master. I have to click on the + sign and
expand the sub-project before the changes are visible in
the master. (If the old subproject was 2 weeks and the
updated one is 4 weeks, I only see the 2 week summary line
in the master, until I expand the sub-project.) I would
have thought that changes should be visible immediately.
Have I missed a configuration option somewhere?
Thanks,