We've installed a PS 2007 trial version in a "test" server. The users will
be testing it with a "real" project and determine if the product is usefull
or not. If so it will be implemented in a production server.

Is there a way to move the already created project from the trial server to
the production server? Any link or idea?

Thanks in advance

Eduardo Martinez
 
M

Marc Soester [MVP]

Hi Eduardo,

you have hit a sensitive point here. Generally it is possible to migrate one
environment into another one. Unfortuanlty at this stage there is a bug that
will make the WSS notification break.

The way we do this at present is actually manually tranfereing the settings
from a test server to a production server. This will need to be the case
until Microsoft decides to fix these issues ( hopefully with SP1)
hope this helps
 