MSP 2007 - How to add custom fields to visual reports

R

Radon

I've created a very simple test MSP file. It has 4 sub-tasks and 2 summary
tasks. I've added resources and duration. I've also inserted the Text1 field
and filled it for each sub-task. I then started the Visual reports. I've
picked the Cash Flow report and edited it by adding Text1 field. When the
report was generated Text1 field was not in the Excel report at all. What am
I doing wrong?

Thanks.
 
A

Andrew Lavinsky

This probably doesn't answer your question, but I've never had much luck
getting fields into the Visual Reports. I prefer to save as Excel and
manipulate the data from there.
 