A
Amey
Dear sir
I have created one sheet in excel which had some linkings from MSP.
But later I found out that the links used to get disabled when ever I
reopened the sheet.I have MSP 2007 and Excel 2007. Can the link be trusted.I
have prepared some cash flows in excel. The start and end dates have been
linked with main shcedule in MSP. So can I trust the links will they hold
good in the longer run? or there is some otherway.
Is there any other way by which my links to the specific fields in
excel will get updated when ever I updated the main schedule in MSP?
I have created one sheet in excel which had some linkings from MSP.
But later I found out that the links used to get disabled when ever I
reopened the sheet.I have MSP 2007 and Excel 2007. Can the link be trusted.I
have prepared some cash flows in excel. The start and end dates have been
linked with main shcedule in MSP. So can I trust the links will they hold
good in the longer run? or there is some otherway.
Is there any other way by which my links to the specific fields in
excel will get updated when ever I updated the main schedule in MSP?