In construction scheduling I want most tasks linked with work days, but some
items are directly related to calendar days, such as concrete cure time. It
would be great if a dependency could use a lead/lag time of SS+3cd (plus 3
calendar days) and count time over weekends, holidays, etc. I can customize
each instance by specifying fewer work days, but if (when) the schedule
shifts then I have to catch each exception to adjust it accordingly.
--
Thanks, Allen
----------------
This post is a suggestion for Microsoft, and Microsoft responds to the
suggestions with the most votes. To vote for this suggestion, click the "I
Agree" button in the message pane. If you do not see the button, follow this
link to open the suggestion in the Microsoft Web-based Newsreader and then
click "I Agree" in the message pane.
http://www.microsoft.com/office/com...a6f4-2dc5d607a0a0&dg=microsoft.public.project
items are directly related to calendar days, such as concrete cure time. It
would be great if a dependency could use a lead/lag time of SS+3cd (plus 3
calendar days) and count time over weekends, holidays, etc. I can customize
each instance by specifying fewer work days, but if (when) the schedule
shifts then I have to catch each exception to adjust it accordingly.
--
Thanks, Allen
----------------
This post is a suggestion for Microsoft, and Microsoft responds to the
suggestions with the most votes. To vote for this suggestion, click the "I
Agree" button in the message pane. If you do not see the button, follow this
link to open the suggestion in the Microsoft Web-based Newsreader and then
click "I Agree" in the message pane.
http://www.microsoft.com/office/com...a6f4-2dc5d607a0a0&dg=microsoft.public.project