OLAP and Resouce Availability Problems

J

Jason C

I am trying to create an OLAP cube in Project. The first time that I tried
I found out that SQL did not have the Analysis Service was not installed.
After it was installed I tried to update my Resource availability prior to
creating a OLAP cube. When I did this I got an error that said "Request:
Status 9104". Apparently this caused an error with the availability
calculation, because my views no show an error that not all information was
published for resources. If I try to update resource availability to create
an OLAP cube I get the same error.

Can anyone tell me what this error is referring to, and any suggestions on
how to correct the problem would be very helpful. I would be grateful for
any help on this.

Thanks in advance, I appreciate your help.

Jason
 
G

Gary Chefetz [MVP]

Jason:

This is most likely a configuration miss and not easy to diagnose through a
newsgroup.

--
Gary Chefetz [MVP]
http://www.msprojectexperts.com

*** Remember to look for line breaks in links posted to the news group, use
cut and paste for these.
 