I have a Project 2003 installation with an existing OLAP
cube. When I attempt an "Update Now" with the "Yes, I want
to update resource availability information and build an
OLAP cube" it fails with the following message.
The cube scheduled to be built on 10/21/2003 at 3:02 PM
failed. (-2147217900) The query has been canceled because
the estimated cost of this query (15) exceeds the
configured threshold of 5.
Can someone help on this problem?
Thanks,
Matt Quinn