Paste link cell

P

Pnina

Hello,

I have the following problem:

I want to link a Cell in one project to another cell from
another project.

I do this by Selecting the source cell (Cost) - Edit -
paste special - paste link into the target project.
This works fine as long as the source cell hasn't change.

BTW, it works fine local, It doesn't work with ths Server.

Thanks

Pnina
 
K

Kevin Flanagan

Why aren't you using the predecessor and successor
external link functionality of the tool to do this?

Kevin
 
P

Pnina

Hi,

Because I need to see the project cost (summary cost)
and I have to see the total cost of the project with the
External cost.
External link show me the task cost, Change the schedule
and It doesn't show me the total cost.

Pnina
 