Planning tool

H

Hans

I want to create a form witch contains the planning for work. In a way
Microsoft Project does.

Example
2007/09/12 2007/09/13 2007/09/14
2007/09/15 etc.
Cleaning Kitchen xxxxxxxxxx xxxxxxxxx
Cleaning Bedroom xxxxxxxxx xxxxxxxxx
etc.


I have a table witch contains:

ID
Item (Cleaning Kitchen)
StartDate
EndDate

Is this possible anyway or should think more in a PivotTable method (and
how)

Kind regards

Hans
 
Top