Print Plus and Minus sign in front of tasks

H

Hazza

Hi,

I was wondering if there's a VBA solution to print the
little plus and minus sign in front of a task to determine
on the print-out if tasks have subtasks or if it shows
rolled up tasks.

I was advised that this is only possible with a VBA macro
or something. I have two left hands when it comes to
coding, so if someone likes to write some code I would be
very happy.

Cheers

Hazza
 
H

Hazza

Thanks John for the reply.

Don't worry about getting that VBA code, I was just
interested if something like that would be possible,
because most people would look at the printed plan the
same as they would look at the plan on the screen.

Thanks again John, and have a good weekend (Friday arvo
here Down Under)

Hazza
 