T
Thorsten
I would like the "Project Priority" Field to be included
in the Portfolio Analyzer and thus beforehand in the OLAP
cube. The idea is to set up a default OLAP field as a
formula equalling it to the [Priority] field.
1. Which OLAP fields are accessible?
2. Any other idea to solve the problem?
in the Portfolio Analyzer and thus beforehand in the OLAP
cube. The idea is to set up a default OLAP field as a
formula equalling it to the [Priority] field.
1. Which OLAP fields are accessible?
2. Any other idea to solve the problem?