Project 2002 connection

J

jeff

This is my second post.
I have a user who uses Project 2002 Professional, and I have configured him
to use the Enterprise options and to log in to the server when he launches
his client.

However, when he does this, he gets an error saying:
Set Non-managed period time setting".
I have checked this setting and it is checked.
I am using the same app and can connect with no issues..

any thoughts. ?
 