Project 2003 - Known problem with EAC field value?

G

G Lykos

Greetings! Noticed an apparent problem where the EAC field in the Earned
Value table appears to be displaying Remaining Cost rather than EAC. VAC
appears to be calculating correctly, tying with the EAC value manually
calculated using the EAC algorithm in Project 2003 Help. Is this a known
problem, and is there a fix (other than coding the correct expression in a
user-defined field)?

Thanks,
George
 