Shane
I've loaded Project Server 2003 and Windows Sharepoint
Services 2003 and was looking at the integration. I was
wondering why WSS task lists aren't hooked into Project
Server Tasks. Did I miss something or is there a way to
tie the two together like we can for Issues and Risks?
Thanks,
Shane