In Project Server 2007 is there a way to save off snapshots of
schedule? Currently we check our schedules into Sharepoint, which ha
file revision history built in, but Project Server 2007 doesn't seem t
have a similar capability.
I realize I can use baselining to track differences between points in
project history, but let's say for example I make a series of updates t
a schedule, publish that project into Project Server, only to find ou
later that the situation has changed and I need to back out all thos
changes. How would I get back?
I suppose one solution is to make a periodic local file copy and chec
it into Sharepoint...?
Thanks
schedule? Currently we check our schedules into Sharepoint, which ha
file revision history built in, but Project Server 2007 doesn't seem t
have a similar capability.
I realize I can use baselining to track differences between points in
project history, but let's say for example I make a series of updates t
a schedule, publish that project into Project Server, only to find ou
later that the situation has changed and I need to back out all thos
changes. How would I get back?
I suppose one solution is to make a periodic local file copy and chec
it into Sharepoint...?
Thanks