Paul Linscott
Resource Pool -
I'm trying to create an enterprise equipment resource and assign it to the
24 hour base calendar. However, when I choose the Base calendar in the
Working Time tab, all I see is the Standard calendar. I thought that Project
comes with 3 types
of base calendars: Standard, shift work and 24X7.
I assigned a task to the 24 hour base calendar with no problem, so I'm a
little confuse as to why it doesn't work for a resource.
All the reference material I have and searched for, mention that the
possibility exists, but I can not find how to do it. Hopefully some one could
help.
thx
Paul
I'm trying to create an enterprise equipment resource and assign it to the
24 hour base calendar. However, when I choose the Base calendar in the
Working Time tab, all I see is the Standard calendar. I thought that Project
comes with 3 types
of base calendars: Standard, shift work and 24X7.
I assigned a task to the 24 hour base calendar with no problem, so I'm a
little confuse as to why it doesn't work for a resource.
All the reference material I have and searched for, mention that the
possibility exists, but I can not find how to do it. Hopefully some one could
help.
thx
Paul