Hello Everyone.
Would someone give me a hand with the following:
I'm trying to capture cost incurred via the My Task option in PWA (PS2007).
I included in the My Assigment View the fields Cost1 and a Custom Field as
well.
I can enter values for them but those values do not get reflected in the
project, after publishing. Though ProjPro I can perfectly enter information
for these fields and publish without a problem.
I looked into the info available and do not find an answer for this behavoir
nor I find a confirmation that I can do this.
regards,
luis.-
Would someone give me a hand with the following:
I'm trying to capture cost incurred via the My Task option in PWA (PS2007).
I included in the My Assigment View the fields Cost1 and a Custom Field as
well.
I can enter values for them but those values do not get reflected in the
project, after publishing. Though ProjPro I can perfectly enter information
for these fields and publish without a problem.
I looked into the info available and do not find an answer for this behavoir
nor I find a confirmation that I can do this.
regards,
luis.-