L
lbailyn
Is there a way for a resource to see their own tasks as well as the tasks of other resources they're responsible for in their timesheet in PWA? We work with a lot of outside contractors, who an internal resources manages. I'd like that internal resource to be able to report on their own progress as well as the progress of the outside contractors. I could have the internal resource log on as themselves, and then log out and back in as each outside resource -but that's obviously not the ideal solution
Ideally, I should be able to assign the outside resource to the internal one, and then the internal one should see all of the tasks and be able to report progress on all of them in PWA. Is there a way to do this?