selection criteria for outlook add in

D

Dave Butler

Is there anyway to extend or change the resource selection criteria for the
outlook add-in? I would like the selection criteria to be based on
MSP_TASKS.TASK_IS_CRITCAL field rather than by resource id.

Thanks

-Dave
 
Top