Setting BCWS and BCWP equal to ACWP in Project 2003

D

Desmond

Generally if you save the baseline after actual costs have been entered, MS
Project will set BCWS and BCWP equal to ACWP. At this time I need to clear
the variances from the Earned Value table and I want to do this by setting
BCWS and BCWP equal to ACWP . However when I save the baseline, MS Project is
not setting BCWS and BCWP equal to ACWP. Instead it is increasing the BCWS.
Can anyone explain why this is not working?
Desmond
 
J

Jim Aksel

I can not seem to duplicate this behavior. Care to donate your file for study?

jeaksel at yahoo dot com
--
If this post was helpful, please consider rating it.

Jim Aksel, MVP

Check out my blog for more information:
http://www.msprojectblog.com
 
Top