Can anyone help, I am trying to setup leave time for some resources. I have
gone through the steps of setting this up within Enterprise Resource pool and
change the dates to non-working time. However whenever I go back to check the
changes don't come through in the PWA or via the Build team Graphs
gone through the steps of setting this up within Enterprise Resource pool and
change the dates to non-working time. However whenever I go back to check the