Naomi Nissen
I'm experienced with Excel formulas and have tried my first one in
Project 2003. I added an enterprise field-resource-cost formula, with
this in the formula window:
[Actual Cost]+[Overtime Cost].
This was accepted by PM. However, when I added a column with that code
as the field name in a project that had the columns "Actual Cost" and
"Overtime Cost", I got an error message: #ERROR.
Thanks for any help. Naomi