Start Project WBS at Zero (0)

C

Colleen

I have seen project plans that start with a WBS of zero (0) to match the ID
or numbering of the row as zero as well, and I cannot seem to figure out how
to get this to work on a new plan besides renaming the WBS manually, which I
don't want to do. My new tasks always start at 1. How can I get the
template to automatically start at zero for the row#/WBS? Thanks.

Example:

0 - Project Name
1 - HR
2 - IT
3 - Sales
etc.
 
C

Colleen

Hi, Thanks for the reply. I'm not that technical, do you have a link or a
way to point me to where I could find this to change the default in the MS
Project Menus? Thanks.

Colleen
 
Top