V
vijayk13
Dear All,
When I build a marquee you can have sizes from 10 x 10 to 90 x 3
sq/mts.
I want to put say in cell A1 = 10 and then in A2 = 10 ( 10 x 10).
Then B1 would be called Poles and B2 = the amount of poles required
depending on what is in A1 and A2.
I hope this makes sense, please contact me if unsure
Vija
When I build a marquee you can have sizes from 10 x 10 to 90 x 3
sq/mts.
I want to put say in cell A1 = 10 and then in A2 = 10 ( 10 x 10).
Then B1 would be called Poles and B2 = the amount of poles required
depending on what is in A1 and A2.
I hope this makes sense, please contact me if unsure
Vija