I have a qty column, a cost(unit) column and a total cost
column. The total cost column has a formula for
multipying the qty column by the unit cost column and
coming up with the correct total cost - per task. Proj
Prof will roll-up the costs of the unit cost column.
However, I cannot figure out how to roll-up the costs in
the total cost column. Anyone have any suggestions?