Thread-Topic: Task is different in list versus its own window
thread-index: Acgl/MjhAOAZo75DS9KVqZElIR+XZQ==
X-WBNR-Posting-Host: 207.46.192.207
From: =?Utf-8?B?Smlt?= <
[email protected]>
References: <
[email protected]> <
[email protected]>
Subject: RE: Task is different in list versus its own window
Date: Tue, 13 Nov 2007 05:55:01 -0800
Lines: 103
Message-ID: <
[email protected]>
MIME-Version: 1.0
Content-Type: text/plain;
charset="Utf-8"
Content-Transfer-Encoding: 7bit
X-Newsreader: Microsoft CDO for Windows 2000
Content-Class: urn:content-classes:message
Importance: normal
Priority: normal
X-MimeOLE: Produced By Microsoft MimeOLE V6.00.3790.2992
Newsgroups: microsoft.public.office.misc
Path: TK2MSFTNGHUB02.phx.gbl
Xref: TK2MSFTNGHUB02.phx.gbl microsoft.public.office.misc:31034
NNTP-Posting-Host: tk2msftibfm01.phx.gbl 10.40.244.149
X-Tomcat-NG: microsoft.public.office.misc
Hi, Emily,
Thanks so much for your response. I will respond to your individual
instructions below the applicable quoted text.
--
Jim
Emily Lin said:
Hi Jim,
Such an issue may be caused that the edited task was not synchronized into the Exchange account properly. Follow the steps below to
test the issue.
#1 Exit Outlook. click Start > Run > type outlook /cleanviews, click OK. Does the Taks show properly?
Yes, the task now shows properly, though it does now mention, "You made
changes to another copy of this item. This is the most recent version.
Click here to see other versions."
However, it appears that this deleted a custom view I had created. Is there
any way to get this back?
#2 If there is OWA interface with your exchange email account, login OWA and check if the Task is correct.
Done, looks fine there.
#3 Change the details of another task on the Pocket PC and then synchronize the changes again. Check the other task in Outlook 2003
again. Does the same issue occur with the other Task?
No, this time there was no issue.
#4 Change the details of a task in Outlook 2003 itself and save it. Does it show correctly in the task list and in the opening task
window?
Yes.
In addition, collect following information for me. My email address is
[email protected].
1. Take a screen shot of the task list which shows the correct details.
2. Take a screen shot of the opening task window which shows the old details.
3. Open the specific task > click File > Save As > save it as Task.msg file and send the file to me.
Since the /cleanviews seems to have resolved this, do you still want me to
do this? I could open the task and open the older version and send that to
you (along with the other things you'd requested), if you'd like.