R
Randy
Hi -
I have two projects (A and B). Project A is a higher
proiorty than Project B.
However, I want a task within Project B (the lower
priority) to be a higher priority than a task in Project
A. These two tasks are assigned to the same resource.
How can this be accomplished without temporarily changing
the priuority of the projects?
Thanks
I have two projects (A and B). Project A is a higher
proiorty than Project B.
However, I want a task within Project B (the lower
priority) to be a higher priority than a task in Project
A. These two tasks are assigned to the same resource.
How can this be accomplished without temporarily changing
the priuority of the projects?
Thanks