That message means that the resource is assigned to more than 8 hours in one
or more days on one or more tasks in the project, such as when the resource
is assigned to 16 hours of Work in a single day time period. Hope this
helps.
Quite right, Jan. This was introduced in Project 2007.
Mike Glen