S
scott45
In my spreedsheet I figure plant hours but the problem I have say my hours
are 7:30 hours. For other calculations I need 7 1/2 hours to read as 7.5. Is
there a way to change 7:30 into 7.5 hours
thanks in advance
Scott
are 7:30 hours. For other calculations I need 7 1/2 hours to read as 7.5. Is
there a way to change 7:30 into 7.5 hours
thanks in advance
Scott