K
Kuku
I did deploy the MS Project Server 2007 in standalone mode. As the standalone
mode doesn't support cube, so it made us cant track the timesheet of all the
assignee.
As I wish the timesheet able to record all user activity but not only on
project(some of them are not work in project basic) and generate a report or
summary for me at the end of month or year. I not sure by deploy and
implement cube and meet the requirement or not, but in standalone more, is
there any way to do this?
mode doesn't support cube, so it made us cant track the timesheet of all the
assignee.
As I wish the timesheet able to record all user activity but not only on
project(some of them are not work in project basic) and generate a report or
summary for me at the end of month or year. I not sure by deploy and
implement cube and meet the requirement or not, but in standalone more, is
there any way to do this?