Timesheet Update by Resource Manager

P

Pat

In PWA 2003 is there any way for someone (e.g. Resource Manager) to
update someone else's actual and remaining work? I am still on 2002 so
I can't check this myself and couldn't find any postings or articles
that dealt with this. If 2003 doesn't have this capability, does anyone
know if it is planned for the future?
Thanks,
Pat
 
Top