Hi,
Does anyone know how to access the MSPROJECT Library from Access. By that I
don't mean opening a Project from Access, but opening the actual Library.
What I want to do is loop through all the various properties in the library
from which I can then create an empty Access table. From there I want to be
able to read the property values from a project and drop them into the Access
Table.
The first challenge is can I access the MSPROJECT library from VBA.
The next challenge is to understand how I could use the property names from
the library to reference the properties in the project.
Does anyone know how to access the MSPROJECT Library from Access. By that I
don't mean opening a Project from Access, but opening the actual Library.
What I want to do is loop through all the various properties in the library
from which I can then create an empty Access table. From there I want to be
able to read the property values from a project and drop them into the Access
Table.
The first challenge is can I access the MSPROJECT library from VBA.
The next challenge is to understand how I could use the property names from
the library to reference the properties in the project.