Unique ID populating Task ID Column in PWA-->Task-->Assign Myself

D

David

Hi,

We've encountered a strange issue which is only ocurring on 1 project.
I do not beleive it is related to SP2A.

Task Unique ID is populating the Task ID Column on page "Assign my self to
an Exisitng Task" in PWA. PWA-->Task-->Assign Myself to an Existing Task.

This does not occur on any other project and in fact does not occur on any
other PWA page for this project.

We've deleted the project from the Server and saved as a 98 mpp. Then
reimported. The issue remains.

What setting have we over looked. This is not a biggie but it's driving the
PM and us absolutley batty!

Has any one else experienced the same or simialr issue?
Does any one have a solution?
 
D

David

Oppps! My bad! Please withdraw this post!

I went through a little Due Diligence and realized our PM is incorrect.

By default column ID on the 'Assign myself to an Existing Task' is populated
with Unique ID values. This does display in all projects.
 
Top