use .60 instead of '100

A

Alain R.

Hi,

the default setting for MS Project is in hundredth. So 1:30 hour should
be converted into 1.5, and 0:45 hour in 0.75 hour.

I've never seen an option which allow us to keep the .60 minutes and
just to write 1:21 hour and not 1.332 hour.

the possible walk-around would be to use the minutes instead hours.... ;-)

thanks a lot
 
J

John

Alain R. said:
Hi,

the default setting for MS Project is in hundredth. So 1:30 hour should
be converted into 1.5, and 0:45 hour in 0.75 hour.

I've never seen an option which allow us to keep the .60 minutes and
just to write 1:21 hour and not 1.332 hour.

the possible walk-around would be to use the minutes instead hours.... ;-)

thanks a lot

Alain,
??? Is this a question? If so, what exactly are you asking? If it's not
a question, what is it?

By the way, we usually do "work-arounds" for schedule problems, not
"walk-arounds". I think the latter is what doctors do ;-)

John