S
smonczka
Can someone clue me into how to use a date in a repeating table so that any
time a new line is added it adds to the date in InfoPath 2003.
For example…
I have a repeating table with two columns, Date and Notes. On the on the
first line, in the first column is Jan 01 2008. A user adds a new item
(line). The date for second line would then be Jan 02 2008.
I have done this in InfoPath 2007 but you cannot calculate off dates in 2003
and my users only have 2003 installed on their systems.
Any idea’s, pointers, references or anecdotes even would be greatly
appreciated.
time a new line is added it adds to the date in InfoPath 2003.
For example…
I have a repeating table with two columns, Date and Notes. On the on the
first line, in the first column is Jan 01 2008. A user adds a new item
(line). The date for second line would then be Jan 02 2008.
I have done this in InfoPath 2007 but you cannot calculate off dates in 2003
and my users only have 2003 installed on their systems.
Any idea’s, pointers, references or anecdotes even would be greatly
appreciated.