J
Jeff S
To start, I am a Project Server novice, so please bear with me. I want an indicator on My Tasks page that will show if the task is on time, late or really late (green, yellow or red). I created a custom field in Project (Task - Duration), with a formula name JeffStatus=[Finish Variance] and set the Graphical Indicators. The field was added to Enterprise. The field is available and flags correctly for projects within Project. The field also appears correctly, with Graphical Indicator data, in PWA | Custom Fields and Lookup Tables | Edit Custom Field: name. On My Tasks, however, the indictor does not appear. What does appear is the column, labeled as the original field (Duration1), and the name, JeffStatus, at the project level within the column.
What am I missing?
Thank you. Jeff
EggHeadCafe - Software Developer Portal of Choice
Is SVG Cool?
http://www.eggheadcafe.com/tutorials/aspnet/6bb8bd7d-25a1-4f33-8d5e-7120406f3385/is-svg-cool.aspx
What am I missing?
Thank you. Jeff
EggHeadCafe - Software Developer Portal of Choice
Is SVG Cool?
http://www.eggheadcafe.com/tutorials/aspnet/6bb8bd7d-25a1-4f33-8d5e-7120406f3385/is-svg-cool.aspx