Always display project statistics

M

Marc Höper

Hi all,

how can I always display selected fields of the project statistics
window (work, costs, ...).

Marc
 
D

davegb

Marc said:
Hi all,

how can I always display selected fields of the project statistics
window (work, costs, ...).

Marc

If I'm interpeting you right, you want some kind of work field and some
kind of cost field to be continuously displayed in Project? If so,
there is no feature like that. You can use the statistics tool (looks
like a jagged W) to bring up the Project Statistics box and see an
overview of the project, but it is not continuously displayed.
 
M

Marc Höper

Hi
If I'm interpeting you right, you want some kind of work field and some
kind of cost field to be continuously displayed in Project?
Yes.

If so,
there is no feature like that. You can use the statistics tool (looks
like a jagged W) to bring up the Project Statistics box and see an
overview of the project, but it is not continuously displayed.

Somehow, I just found it... In Options->View activate Project Summary
Task. That's what I've been looking for. Actually, I was looking for
some small window that stays on top of the plan showing the project
summary for duration, work and costs.

Marc
 
D

davegb

Marc said:
Hi


Somehow, I just found it... In Options->View activate Project Summary
Task. That's what I've been looking for. Actually, I was looking for
some small window that stays on top of the plan showing the project
summary for duration, work and costs.

As I said above, no such window feature exists.
 