M
MJL
Is there any way to calculate resource costs based on % of other costd associated in the project? For example, if I have a resource whose cost is 5% of the total fees charged by an architect. As in Excel, can I link the cost of a resource to another figure, or do I have to perform the calculations in a different program (ie Excel) and link the result back into Project 2003? Thank you in advance for the help.