We are getting ready to implement Project Server. For each resource we have
a Project Labor Category (PLC). The rates are the same for everyone with the
same PLC. Is there a way to assign a rate table to each of the resources
with the same PLC? An example would be that Bob, Joe and Sue are all
Engineer IV's. I would like to build one table for the Engineer IV's
including annual rate increases.
thanks
Paul