KCK said:
I am currently using MSProject
I need to produce a report that will show separate $$$ totals for labour
and also for material.
The predefined reports do not seem to be able to do this. Is there some
other way?
thanks for any help
kck
KCK,
I depends somewhat on how you entered the material. If you used the
Fixed Cost field, (and this isn't necessarily the best field for all
material), then that field will obviously have the material total. The
Cost field will be the sum of labor cost and fixed cost so you would
need to set up a custom field with a formula to subtract out fixed cost
from cost.
If you identified resources using the Type field on the Resource Sheet,
(Work for labor and Material for material), then you can easily separate
out the cost by using the Resource Usage view and the grouping function.
Group on the Type field.
Other variants of reporting are possible depending on how the resource
are assigned, (e.g. labor and material separately), what format output
you want and whether you need to be able to show costs for selected
tasks (i.e. not the whole project).
Hope this helps.
John
Project MVP