P
Penelope
Hi All
I have a project (MS Project 2003) and I want to be able to convert a
project task into an Outlook task, both for myself and to send to my
colleagues. If I follow the usual MS logic, I should be able to click and
drag (they have the same fields, after all), but it doesn't work. I've
looked at all sorts of things, but can't get them to work either.
It seems like such an obvious requirement, I can't believe it isn't there.
I know there are a lot of options with MS Project Web, but that's not what I
want at the moment.
So, am I doing it wrong, or is it not there?
Thanks!
Penelope
I have a project (MS Project 2003) and I want to be able to convert a
project task into an Outlook task, both for myself and to send to my
colleagues. If I follow the usual MS logic, I should be able to click and
drag (they have the same fields, after all), but it doesn't work. I've
looked at all sorts of things, but can't get them to work either.
It seems like such an obvious requirement, I can't believe it isn't there.
I know there are a lot of options with MS Project Web, but that's not what I
want at the moment.
So, am I doing it wrong, or is it not there?
Thanks!
Penelope