I have some tasks that were assigned inadvertently by the
wrong Project Manager. In MS Project Pro, the "Project
Manager" field does not exist (i.e. at least under this
name). However, if I look at the assignment in Project
Web Access the "Project Manager" field exists and is
viewable.
I have two questions:
1. How can I change the "Project Manager" on a specific
Task?
2. Also, how can I identify this field in Project Pro?
Thanks,
Justin