Hello everyone!
I just setup a Project Server 2007 for testing, created a project and have
been working with it via the PWA portal just fine. I'm now trying to use the
integration with Outlook 2007 to enter time via the timesheet.
I have installed the outlook add-in from the project server link, I've
synced and added the tasks to outlook.
However, when I open the task, the task does not have any Project
information like the timesheet tab, etc. It's just a generic task type.
What am I missing?
I just setup a Project Server 2007 for testing, created a project and have
been working with it via the PWA portal just fine. I'm now trying to use the
integration with Outlook 2007 to enter time via the timesheet.
I have installed the outlook add-in from the project server link, I've
synced and added the tasks to outlook.
However, when I open the task, the task does not have any Project
information like the timesheet tab, etc. It's just a generic task type.
What am I missing?