Quantifying task and calculating resource

A

Asif Memon

I want to add task of "pouring concrete" of 100 cubic metre. each cubic meter
requires 400 kg of cement and 1.50 cum aggregate. How can i work out total
resource requirement and assign these resources?
 
J

Jan De Messemaeker

Hi,

Calculate resuirement of each material: with a pocket calculator.
Assign these resources: create them as material resources than in the assign
resources window select, fill in the units, assign.

HTH
 