Hi everyone,
I'd like to set the constraint across an entire project to "As Soon As
Possible" and lock it down so it can't change unless I specifically direct
it to. What I'm aiming to do is keep the constraint type set at "As Soon
As Possible" even if a start or finish date is entered in directly on the
task sheet, which normally changes the constraint type to "Start No Later
Than". Is there a way to do this when initially setting up a project
timeline? Thanks.
Andrew