I am wanting to time scale a volume of preload volumes of material to
determine the best use of material.
How can I allocate quantities to a resource called "preload"
I must be able to export to EXCEL to graph its use with the Task Description
determine the best use of material.
How can I allocate quantities to a resource called "preload"
I must be able to export to EXCEL to graph its use with the Task Description