Why Does MSP2K7 Pro Insert a Row when pasting into the predecessor field. I
am running MSP2K7 server and have a Master Project with 6 subs. If I open up
one of the sub projects and type or paste a predessor link into the
predecessor field, a brand new row is inserted into the project. The row
that is inserted is from the linked project. Why does this happen?