I have a project with a release-based schedule. I'm on my last release now,
and have been asked to provide Earned Value metrics from the start of this
release to the end of the project. The schedule has to be loaded into
Deltek's Cobra (EVM Tool). How can I create a subproject for this and still
have certain tasks linked to those that have been completed. I'm working in
MS Project 2003.
Thanks for your help,